D60 Distance Transmission Line Protection

What is my take-home:

All the fundamentals you need for Transmission Line terminology, Distance theory, Distance schemes and protection.
Correct configuration of the D60 Distance files and testing is thoroughly covered.

Who should attend?


Electrical maintenance team Electrical design engineers

Utility managers on their journey of gaining a better understanding of Transmission Line protection and the use of UR GE Multilin transmission protection relays.

Recommended prerequisites: Electrical professional credentials UR family platform level-1

Recommended duration:
2 days stand alone course
or
1 day + 2 days UR family platform level-1 (recommended!)


Suggested Agenda

Day 1:

Transmission Line fundamentals

Relaying basics
Circuit Breakers
Primary and Backup relaying
Introduction to Symmetrical component
Current and Potential Transformers

Day 2:
Introduction to Transmission Lines

Distance protection theory
Stepped distance
Zone 1 extended
Pilot aided schemes: DUTT, PUTT, POTT, HYBRID POTT, Directional-blocking
Power swings
D60 overview
Protection element calculations for a typical D60 application

 